Tocumen
|
|
| Status: Underconstruction |
|
| Project |
security
• Project fully fenced
• Security gate with 24 hour access control
• CCTV system covering all public areas, forward to entries from all galleries
• Edge Lighting System and internal roads
convenience
• 15 minutes from downtown and 2 minutes from Tocumen International Airport
• Access and highway designed for the free movement of containers 40 \\\\\\\\ \\\\\\\'
• Project Management Offices within the area
• Rental of Forklifts and other equipment and services for members of the project.
amenities
• cafeteria and dining area exclusively for project members
• Recreational area and games exclusively for members of the project
On the Galeras
• Anden for loading and unloading trucks and containers
• 20m2 of office area
• 2 bathrooms
• 3 parking spaces for exclusive hold
• Possible construction design modifications to the measure (limited time)
http://tocumenstorage.com/ |
|
| |
|
|
|
|