Tocumen

 Status: Underconstruction

Project
security

• Project fully fenced

• Security gate with 24 hour access control

• CCTV system covering all public areas, forward to entries from all galleries

• Edge Lighting System and internal roads

convenience

• 15 minutes from downtown and 2 minutes from Tocumen International Airport

• Access and highway designed for the free movement of containers 40 \\\\\\\\ \\\\\\\'

• Project Management Offices within the area

• Rental of Forklifts and other equipment and services for members of the project.

amenities

• cafeteria and dining area exclusively for project members

• Recreational area and games exclusively for members of the project

On the Galeras

• Anden for loading and unloading trucks and containers

• 20m2 of office area
• 2 bathrooms

• 3 parking spaces for exclusive hold

• Possible construction design modifications to the measure (limited time)

http://tocumenstorage.com/

 

 
Photo Gallery


  Next

Plans



design by adestudio